AIREA operations product walkthrough - REVIEW DRAFT

Use these checked records during an AIREA demo or pilot after an approved source has been made available. The CSVs are reference files, not instructions for an AIREA upload or connector. Run the guide prompts in Ask AIREA, inspect Generated Outputs and Lineage View, pin evidence, add Key Context, then review and share a current Analysis Result. Record what AIREA actually returns in the workbook; keep those observations separate from the checked reference answers.

These compact reference records support method review. They are not AIREA product results or a benchmark.

Main question: Which group of late order lines deserves investigation first? Count order lines, not dispatch rows or orders. Original promised ship day runs until just before the next local midnight in America/Toronto. Period: October 1–31, 2026 inclusive. Dispatch observation through November 5 local day end. An eligible line is late if full required units were not dispatched by the original promised day. A full cancellation on/before promise excludes a line; later cancellations remain in the late cohort. A missing original promise is unresolved. All known dispatch events are included through the observation cutoff.

Historical release review: snapshot is 17:00 on each original promise date, America/Toronto. Ready means usable allocated units covered units still due at 17:00 and no active order hold. E06 has no snapshot, so readiness is unresolved. 'Next morning' means release by 08:00 on the next local calendar day. This timing check does not prove a cause.

Supplier job branch: Count each job ID once, even when it has multiple material lines. Compare the complete-material availability date with the original planned job-start date. Same-day availability does not prove material was ready at the scheduled start time. No order-line causal link or actual job-start record is supplied. Confirm inspection/availability history in a real investigation.

Returns branch: Two equal 28-day delivery cohorts (August 3–30 and August 31–September 27). Count returns within 28 days after each delivery, with records through October 25. These observations do not explain October dispatch lateness.

Inventory branch: One Item A / East location movement window, October 1–28. Closing units reconcile from opening plus receipts and transfers in, less transfers out and customer shipments. Commitments and buffer are planning constraints. Movement alone cannot establish excess stock or future demand.

Return receipt boundary: include a return only when its local receipt date is later than delivery date and no later than delivery date plus 28 calendar days. Day 0 is excluded; day 28 is included. The aggregate cohort source assumes these boundaries.
